Updates about community projects, road construction and closures will be posted here, on our Facebook page and through our Text Alert System.    

Roundabout Project at 117th & Randolph Street

The Town of Winfield, with funding from the Federal Highway Administration (FHWA) and administrative oversight from the Indiana Department of Transportation (INDOT), proposes to proceed with a project for improvements to the 117th Avenue/Randolph Street intersection.

See the LEGAL NOTICE and files below for details.

LEGAL NOTICE OF PLANNED IMPROVEMENT

 

The Town of Winfield is developing plans for proposed 117th Avenue at Randolph Street Intersection Improvement in Lake County (DES. # 2101168). 

The purpose of this project is for the intersection of 117th Avenue at Randolph Street to operate at a LOS B or better at peak hours through the design year of 2041.  Under the current conditions,  there are excessive traffic queue lengths, with individual lane groups currently operating as low as LOS F (unstable traffic flow with bottlenecks) during peak hours.       

The project proposes to construct a single lane roundabout with sufficient pavement that can be re-striped in the future to provide dual-lanes for eastbound and northbound legs of the intersection.  The anticipated length of roadway approach work is approximately 600 feet along the west approach and approximately 500 feet along the remaining approaches.  An eight-foot-wide sidewalk will be provided through the project to provide continuous accessibility with existing and future pedestrian facilities.  ADA compliant curb ramps will be used at all intersections and splitter islands.  Storm sewer will be installed to drain the new intersection to existing ditches and swales within the project area.   

The proposed construction of this project will require 1.167 acre of new permanent right-of-way and 0.006 acre of temporary right-of-way.  No relocations or displacements are necessary. 

The maintenance of traffic (MOT) plan proposes to detour vehicular traffic during construction.  Access to all properties will be maintained throughout construction. School corporations and emergency services will be notified of closures prior to construction.  The proposed start of construction is 2027. 

The cost associated with this project is approximately $4,360,000.00 which includes preliminary engineering, right-of-way, and construction with both federal and local funds anticipated to be used.  The Federal Highway Administration (FHWA) and INDOT have agreed this project falls within the guidelines of a Categorical Exclusion (CE) Level 2 environmental document.  Preliminary design plans along with the CE/EA/EIS are available for review at the following locations:

  1. Winfield Town Hall – 10645 Randolph Street, Winfield, IN 46307
  2. Winfield Library – 10771 Randoph Street, Winfield, IN 46307
  3. DLZ Indiana, LLC – 900 Ridge Road, Munster, IN 46321
  4. Town of Winfield Website – https://www.winfield.in.gov/community-projects

All interested persons may request a public hearing be held and/or express their concerns by submitting comments to the attention of Trisha Nugent, PE, 900 Ridge Road, Ste L, Munster, IN 46321 or by telephone at 219-836-5884 or by email at tnugent [at] dlz.com (tnugent[at]dlz[dot]com) on or before (December 31, 2025).  In addition, project information, including the environmental document, may be mailed to interested persons upon request.   

         

          In accordance with the Americans with Disabilities Act (ADA) and Title VI of the Civil Rights Act of 1964, persons and/or groups requiring project information be made available in alternative formats or in another language are encouraged to contact the Town of Winfield  Town Hall for the arrangement and coordination of services. Please contact Nick Bellar, Town Manager at 219-662-2665 x304. 

 

This notice is published in compliance with: 1) Code of Federal Regulations, Title 23, Section 771 (CFR 771.111(h)(1) stating, “Each State must have procedures approved by the FHWA to carry out a public involvement/public hearing program.”; 2) 23 CFR 450.210(a)(1)(ix) stating, “Provide for the periodic review of the effectiveness of the public involvement process to ensure that the process provides full and open access to all interested parties and revise the process, as appropriate.”; and 3) The INDOT Project Development Public Involvement Procedures approved by the Federal Highway Administration on July 7, 2021.